30 North LaSalle
30 N LaSalle St, Chicago, IL 60602
22% provisional source coverage
USE BOUNDARYNot verified · Not dispatch ready
30 North LaSalle is a Loop office tower under a planned partial office-to-residential conversion. Golub states that a lender engaged it to manage the distressed asset after it entered receivership, while Transwestern publicly markets the remaining office space. The building's transition makes current operating rules especially time-sensitive; no public dock, freight, move, COI, contractor, or reservation workflow was confirmed. The record is graph mapped, not verified or dispatch ready.
Canonical identity
Current Golub and Transwestern sources resolve the building, management and leasing relationships while also exposing a material transition in use. Sources disagree on year, stories, and area. Because construction timing, title, active floor use, and operating requirements can change during redevelopment, every field-action claim remains held for current written confirmation.
Area claims stay separate
Gross, rentable, and office area are not interchangeable. Factum stores each measurement with its source meaning instead of choosing a convenient single number.
What public guidance supports
These are sourced research answers, not permission to enter, reserve, submit, or dispatch. Current affected-party authorization remains required.
Management and leasing relationships
Golub describes its lender-engaged management role, while Transwestern publishes current office-leasing contacts. Neither relationship alone establishes authority to approve a job or disclose current operating rules.
Golub and Transwestern pages captured 2026-08-13Active-use transition
Golub describes a planned conversion introducing approximately 349 apartments while retaining commercial use. Floor scope, construction timing, access routes, and operating conditions must be revalidated as the project changes.
Golub page captured 2026-08-13; construction timing not statedJob-operation boundary
No reviewed public source establishes current dock, freight, delivery, move, COI, contractor, access, reservation, fee, protection, riser, or durable confirmation procedures. Written affected-party authorization is required before field work.
Public-source review completed 2026-08-13Questions this record answers
Each concise answer includes the same caveats shown elsewhere on the page.
01What is happening at 30 North LaSalle?+
Golub describes a planned partial office-to-residential conversion introducing approximately 349 apartments while the property continues to market office space. The timing and active floor scope were not confirmed in this review.
02Who manages and leases 30 North LaSalle?+
Golub says a lender engaged it to manage the distressed asset after receivership in 2022. Transwestern publishes the current office-leasing page and contacts. These relationships do not establish title or job-approval authority.
03Are delivery, freight, move, or COI rules public?+
No current building-specific operating rules were confirmed. The redevelopment makes current written requirements and a provider-generated confirmation particularly important.
04Why do the year, story, and area figures differ?+
Golub lists 1975, 44 stories, and 980,000 square feet; Transwestern lists 1974, 43 stories, and 982,576 square feet; the City reports 1,095,104 gross square feet. Factum preserves the source-specific claims.
05Can this record be used to dispatch a job?+
No. It is graph mapped but not independently verified or dispatch ready. Current affected-party authorization and a durable confirmation receipt are still required.
06How can a building team correct this record?+
Get early access and share a correction, current handbook, link, forwarded email, or a few notes. Factum does not ask for credentials or sensitive security information.
Explicit unknowns
Anything operationally material that is stale, incomplete, or unconfirmed remains visible here.
- 01Current beneficial ownership, receivership status, lender identity, and authoritative parcel identity.
- 02Construction start, phase boundaries, occupied floors, temporary routes, and current office-versus-residential scope.
- 03Current loading-dock location, freight resource, dimensions, capacity, reservation route, availability, and fees.
- 04Current delivery and move windows, COI terms, labor and contractor requirements, visitor access, protection, parking, permits, disposal, and telecom-riser procedures.
- 05Current provider-generated approval and confirmation format for any building action.
Evidence register
Source links are direct. Authority and supported claim groups are stated so readers can inspect the underlying record.
- 0130 North LaSalle portfolio page ↗
Golub & Company, published manager · Supports: Management relationship, receivership context, project identity, manager-listed area and conversion plan
- 0230 North LaSalle leasing page ↗
Transwestern, published leasing representative · Supports: Current leasing relationship, public role contacts, listing area, year, stories, and high-level property facts
- 0330 North LaSalle official marketing site ↗
Official building marketing site · Supports: Current building identity, office positioning, amenities, and leasing route
- 04Chicago Energy Benchmarking Results ↗
City of Chicago · Supports: 2023 City-reported gross floor area and census identity