James R. Thompson Center
100 W Randolph St, Chicago, IL 60601
67% provisional source coverage
USE BOUNDARYNot verified · Not dispatch ready
James R. Thompson Center is a commercial redevelopment at 100 W Randolph St, Chicago, IL 60601, associated with Chicago benchmark ID 101742. It is Graph Mapped as a Public Seed, not Verified or Dispatch Ready.
Canonical identity
The James R. Thompson Center is a landmark commercial-building redevelopment at 100 W Randolph St in Chicago. City identity and permit evidence plus a first-party redevelopment plan support the bounded public record; current construction, completion, occupancy, title, control and action authority remain unverified.
Area claims stay separate
Gross, rentable, and office area are not interchangeable. Factum stores each measurement with its source meaning instead of choosing a convenient single number.
What public guidance supports
These are sourced research answers, not permission to enter, reserve, submit, or dispatch. Current affected-party authorization remains required.
Public identity
The James R. Thompson Center is a landmark commercial-building redevelopment at 100 W Randolph St in Chicago. City identity and permit evidence plus a first-party redevelopment plan support the bounded public record; current construction, completion, occupancy, title, control and action authority remain unverified.
Sources reviewed 2026-08-18Evidence boundary
Parcel, title, control, management, operator and action authority are not inferred from public identity evidence.
Boundary reviewed 2026-08-18Coverage state
Public Seed / Graph Mapped only; explicit unknowns and preserved conflicts remain for later enrichment.
Accepted 2026-08-18Questions this record answers
Each concise answer includes the same caveats shown elsewhere on the page.
01What is James R. Thompson Center?+
The James R. Thompson Center is a landmark commercial-building redevelopment at 100 W Randolph St in Chicago. City identity and permit evidence plus a first-party redevelopment plan support the bounded public record; current construction, completion, occupancy, title, control and action authority remain unverified.
02Is James R. Thompson Center ready for dispatch?+
No. It is a Public Seed and Graph Mapped, not Verified or Dispatch Ready.
03What remains unknown about James R. Thompson Center?+
parcel or assessment identifier recorded title holder beneficial owner or controlling entity current building-wide manager or operator current occupancy and public-access status whether physical construction is occurring at the retrieval moment whether work is complete certificate of occupancy outcome operating rules authority contacts
Explicit unknowns
Anything operationally material that is stale, incomplete, or unconfirmed remains visible here.
- 01parcel or assessment identifier
- 02recorded title holder
- 03beneficial owner or controlling entity
- 04current building-wide manager or operator
- 05current occupancy and public-access status
- 06whether physical construction is occurring at the retrieval moment
- 07whether work is complete
- 08certificate of occupancy outcome
- 09operating rules
- 10authority contacts
Evidence register
Source links are direct. Authority and supported claim groups are stated so readers can inspect the underlying record.
- 01City of Chicago ↗
direct row read-back; no verification-year field returned · Supports: Chicago Energy Benchmarking - Covered Buildings; Does not establish parcel, title, control, authority or dispatch readiness.
- 02City of Chicago Department of Buildings ↗
permit issued 2026-03-16; direct row read-back · Supports: Building Permits record 3433484 / permit 101077075; Does not establish parcel, title, control, authority or dispatch readiness.
- 03Google (first-party post) ↗
published 2023-12-13 · Supports: A first look at the plans for our new Chicago office; Does not establish parcel, title, control, authority or dispatch readiness.
Public change history
Only meaningful, accepted public deltas appear here. The current record above remains canonical.
James R. Thompson Center
James R. Thompson Center was added as a public, evidence-bounded building seed at 100 W Randolph St; unresolved enrichment and authority fields remain explicit.